LCRA logo
Contact Us
Energy Water Community Services Environment & Education About LCRA
spacer
Home Page Header Image
spacer
Energy
 
spacer
Medina Lake-to-CPS Project

Project Update
March 18, 2009: LCRA intends to start construction activities for this project during the June/July 2009 timeframe. Project completion is currently scheduled for late January 2010.

Previous Project Updates
Aug 6, 2007: On July 27, the Public Utility Commission of Texas approved Route 14 for construction. This route, which mostly parallels FM 1283, consists of segments B-E-G-K-N-O-Q1. Download a map of the approved route

For more information about this project, please visit our web site or contact:

LOWER COLORADO RIVER AUTHORITY
Transmission Project Management Office
Attention: Denise Wolff
P.O. Box 220
Austin, Texas 78767-0220
(800) 776 5272, ext. 1816
(512) 473 3200, ext. 1816

back to top
fyi
  • Preferred and alternate routes map (pdf)
  • Environmental assessment and route analysis (36 MB pdf)
  • Project brochure (pdf)
  • Study area map (pdf)
  • Q&A (pdf)
  • Open house materials (pdf)
  • Aerial map (pdf)
  • Environmental constraints (pdf) (37 MB)
  • Land-use constraints (pdf) (31 MB)
— Updated April 21, 2009 09:30 AM arrow Print this page
 
spacer Quick Paths spacer arrow  Energy Home spacer   Air Quality spacer   Renewable Energy spacer
spacer Contact LCRA spacer Sitemap spacer Privacy Policy spacer Open Records Information    Login
© 1996-2009 Lower Colorado River Authority. All rights reserved.