by priscilla | Nov 19, 2026 | energy, one-column-page
Limmer to Muscovy 345-kV Transmission Line Project Additional project information will be available on this webpage in coming...
by A F | Nov 10, 2026 | energy, one-column-page
Bakersfield to Nevill Road to North McCamey 345-kV Second Circuit Transmission Line Project LCRA Transmission Services Corporation (LCRA TSC) and Garland Power & Light (Garland) propose to add a second circuit to an existing 345-kilovolt (kV) transmission line...
by A F | Jun 24, 2026 | energy, one-column-page
Bakersfield to White Baker 345-kV Transmission Line Project LCRA Transmission Services Corporation (LCRA TSC) and Texas-New Mexico Power Company (TNMP) filed a joint application with the Public Utility Commission of Texas (PUCT) to amend their Certificates of...
by priscilla | May 8, 2026 | energy, one-column-page
Cooks Point to Steele Store Transmission Project LCRA Transmission Services Corporation (LCRA TSC) and Bryan Texas Utilities (BTU) are jointly proposing to build and operate a new 138-kilovolt single-circuit transmission line in portions of Brazos and Burleson...
by A F | May 30, 2025 | energy, one-column-page
Bell County East to Big Hill 765-kV Transmission Project Project Background and Need In response to unprecedented load growth in the Permian Basin region, LCRA TSC and Oncor are jointly proposing to build and operate a new Electric Reliability Council of...
by A F | May 30, 2025 | energy, one-column-page
Big Hill to Sand Lake 765-kV Transmission Project Project Background and Need In response to unprecedented load growth in the Permian Basin region, LCRA TSC and Oncor are jointly proposing to build and operate a new Electric Reliability Council of Texas-recommended...
Social Media